Challenge
To provide radiant heating and cooling at JFK Airport’s Terminal 1 Lobby.
Solution
Uponor’s pre-engineered Radiant Rollout Mats are designed for large-scale commercial projects where laying tubing by the coil is not labor efficient. The Rollout Mats reduces the use of wire ties and staples and the time it takes for installation. It also has a reverse return header option for better balancing. With the immense lobby space and glass façade, radiant cooling offers an efficient way to absorb the large sensible load from solar gain.
Products on the Job
Uponor Radiant Roll-Out Mat
(29x) Taco Vertical Inline KS Pumps
